|
AL ASBAR GROUP OF COMPANIES is based in Dubai – United Arab Emirates. The brand (Al Asbar) is the local name of Arabic leopard representing speed and determination.
The Group is one of the leading business companies specialized in manufacturing and fitting military equipments and accessories, in addition to civilian manufacturing and engineering.
The company was established in the year of 2001 and consists of the following companies:
• Al Asbar Auto Industries LLC
• Al Asbar Auto Development
• Al Asbar Auto Accessories and Development.
The Group’s credentials, business strength and standings in the local market and with Government Bodies are well known in and around U.A.E and GCC countries. The consolidated turnover for the year 2006 – 2007 is in excess of AED 50 Million.
Al Asbar Group represents some of the world’s ranking companies like Mile Marker of USA, International Trucks of USA, AGP Glass of USA, Dobinson Suspension of Australia and many more.
II - About Al Asbar Auto Industries L.L.C
Al Asbar Auto Industries L.L.C. is specialized in designing, manufacturing, supplying and installation for armored vehicles. Also, provide research and development work for different types of vehicles as per the need of department or individual.
Al Asbar has professionally qualified, trained and well experienced engineers for military in their system integration team supported by well established facilities for all the activities.
Al Asbar has full fledged backing of the Group strength from their in house engineering, financial and administrative capabilities to promote the state of the art products.
Our products are tested and certified by high ranked government departments and are of International standards.
For the purpose of maintaining highest quality control, the Group has “Quality Management Department” and the top level staffs and directors are directly involved for the functioning of this department.
Group’s Functions and Operation theory
Project & Prototypes
1. Brain Storming 2. Project 3. Structure test 4. Dimension control 5. Prototyping 6. Functional testing 7. Structural stress testing 8. Tests on Components 9. Engineering 10. Project Re-examining 11. Finalization
Hydraulic division
1. Material quality control 2. Cutting 3. Pistons machining 4. Cylinder barrel 5. Cylinder Welding 6. Assembly 7. Identification 8. Final Testing
Metal work
1. Components receiving 2. Primary control 3. Steel cutting 4. Machining 5. Bending 6. Assembling and welding 7. boring 8. dimension test
Assembly and Control
1. Material approval 2. Quality control 3. Goods stocking 4. Warehousing 5. Planning 6. Product line 7. Assembling areas 8. Timing survey 9. Product coding and tracking
Product Line
1. Functional test 2. Cleaning and washing 3. Primary paint 4. Painting and drying 5. System assembly 6. Functional test 7. Calibration of all systems 8. Final quality control 9. Dispatch and delivery
|